Galway Regatta

The Galway Regatta is run on an annual basis on the River Corrib. The event is based on a three lane race down a course of 1200 metres. There are a large number of crews  entering the water whilst others are leaving at the finish of their event. Sensible traffic control at the slips prevented accidents and also ensured that there are not too many crews located in the one area at any time- a recipe for disaster if tempers fray. The event is run to strict time schedule which means that all areas have to be clued-in and updated regularly to ensure smooth running. Any delays result in total congestion which can result in accidents.

Tom, EI2GP, was located at the start line of the race and would advise when crews are leaving and heading down the course. At this point the operator on the slips ensures that boats do not row onto the course and also prevents the area becoming too congested at the same time. Steve, EI5DD was located at the finish line which is where the organisation and logistics of the event took place. Message handling involved

  1. Passing information about crews who would not be taking part and therefore not taking to the water
  2. Crews who would be participating at a later stage as a result of winning their race and therefore entering a semi-final or final (information required to determine what time the boats would be going back on the water)
  3. Calling for crews to row towards the start as quickly as possible
  4. Advising of any river traffic heading up the course, and
  5. Logging of accidents during the event and deployment of safety crews.

From 9 am there was a constant flow of information as crews were co-ordinated to a strict schedule in order to accommodate the number of races during the day. There were stiff breezes which affected some of the less experienced crews often blowing them off course and into reeds. Rescue crews were quite busy under the circumstances. The water level of the Corrib was also lower than usual, due to the recent dry spells.  A couple of crews ran aground and had to be towed off the rocks whilst another actually capsized.  The slip area was constantly busy under the auspices of Enda, EI3IS. Enda was updated with changes to the schedule and thereby able to call crews to the water as required. Messages regarding crews encountering difficulty with equipment were passed enabling their event to be re-scheduled.

The operators at this event have become quite familiar with how it ‘runs’ this year,  new operators were present and were monitoring the activity to observe, consider the implications of incorrect information being passed as the event progresses, before taking part the following year.

Tags: , , ,

Comments are closed.